My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/18/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
12/18/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:34:35 PM
Creation date
7/8/2014 11:34:07 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
12/18/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />and along this project. Mitigating freeway sound pollution is an AUAR issue. (AUAR <br />item 21.8). <br />Revised landscape plans must be approved by staff and brought back to the <br />Environmental Board for review. <br />A City approved native vegetation seed mix should be used in all ponds, water <br />treatment/filtration areas, and other surface water management areas. This is an AUAR <br />mitigation requirement. <br />The developer must supply 1 foot contours (if deemed necessary by the City Engineer) <br />and drain tile mapping for the project as per AUAR requirements. <br />AUAR Historic /Cultural <br />The adopted AUAR document states that if there are "Areas of High Ecological <br />Potential" identified by the AUAR Study on the site, further study must be given to <br />cultural investigation. There are no identified Areas of High Archaeological potential on <br />this site. <br />RECOMMENDATION <br />Staff recommends changes and additions be made in reference to staff comments and <br />Environmental Board review comments. <br />ATTACHMENTS <br />1. Excerpts of the Plan Set prepared by Carlson McCain dated November 8, <br />2013 and received by the City on November 12, 2013. <br />2. AUAR Mitigation Plan Summary <br />3. Soil Survey <br />4. NWI Map <br />5. Soil Boring Map <br />6. NorthPointe Wetland Preservation Corridor and Natural Resources Area Map <br />7. Traffic Noise Analysis Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.