Laserfiche WebLink
Lino Lakes Public Services Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />2003 PARKS AND RECREATION DEPARTMENT <br />ACCOMPLISHMENTS <br />Parks <br />• Clearwater Creek Park Development - Completed development of 5.5 acre park <br />including final grading of the entire park area, poured 6 ADA trail entrance ramps <br />and 4 bench pads, installed 1/2 court basketball court, paved internal trails, installed <br />irrigation system, landscaping, seed entire park area, installed 1800 lineal feet of <br />continuous curb around landscape beds, installed landscape block for landscape <br />bed for future park sign, and installed site furnishings. <br />• Highland Meadows Park Development - Completed development of 4 acre park <br />including installing playground equipment and wood fiber safety surfacing, the 1/2 <br />court basketball court, irrigation system, landscaping, seeding the entire park area <br />including washed -out prairie areas, and installed park amenities including park <br />benches and picnic tables. <br />• Rice Lake Elementary - Graded and installed base for full size basketball court. <br />• Behm's Park - Graded and installed base for 1/2 court basketball court. <br />• Birch Park - Ordered open air shelter for spring, 2004 installation. <br />• Completed Birch Park boardwalk and landscaping project. <br />• Sunrise Park - Paved parking lots and reclaimed several areas within park for <br />maintained turf. Also renovated warning track s at Sunrise #1 and Sunrise #2. <br />• Pheasant Hills Park - Installed 40' of 6' high chain link fencing behind basketball 1/2 <br />court to keep balls from entering wooded area. <br />• Installed park bench with concrete pad adjacent to trail near LaCasse Drive. <br />Installed two park benches with concrete pads along trail segment near Timberwolf <br />Trail. <br />Planted over 100 new and replacement trees in City parks, including 35 in Behm's <br />Park. <br />• Transplanted 45 trees slated for removal along Elm Street. <br />• Removed and trimmed trees along roads, trails, and parks from June 24th storm. <br />• Removed several hazard trees at Sunrise Park and near Timberwolf Trail. Also <br />removed several stumps at Sunrise, Country Lakes and Lino Park. <br />• Installed vinyl flooring, painted all walls, and installed shelving at Marshan Park <br />storage building. <br />• Renovated landscape bed in front of Council Chambers. <br />• Assisted Environmental Coordinator with removal of high risk oak wilt trees. <br />• Several staff attended MTI University seminar - Irrigation, turf establishment and <br />maintenance, and sports turf. <br />Attended shade tree short course. <br />• Attended CPR and other safety training. <br />• Conducted AWAIR, Right -To -Know Training. <br />• Staff attended chain saw safety and defensive driving training classes. <br />