My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/02/2004 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2004 Park Board Packets
>
02/02/2004 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 5:09:20 PM
Creation date
7/8/2014 1:13:57 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/02/2004
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Board Meeting — January 5, 2004 <br />Minutes <br />• Started charging for storage of seized vehicles at $100 per vehicles. Total of 24 seized <br />vehicles this year. <br />• Assisted with Recycling Day. <br />• Removed dead trees and trimmed brush along roadways. <br />• Repaired 6 failing catch basins. <br />• Replaced/Installed 5 culverts throughout city. <br />• June 25 - Cleaned up trees and repaired washout of mudslide on Bald Eagle Blvd. <br />• Painted and installed signage for new crosswalk on Bald Eagle Blvd. <br />• Removed and replaced public used oil tank, painted confinement tank at Public Works <br />facility. <br />• Conducted annual snowplow safety seminar. <br />• Maintenance workers attended chain saw safety seminar. <br />• All employees attended harassment seminar. <br />Utilities <br />• Completed Black Duck lift station replacement project (lift station #1) <br />• Installed new pump at lift station #7. <br />• Installed new cabinet in tower #1 for SCADA control. <br />• Installed redundant chlorination device at tower #1 to improve water quality. <br />• Installed auxiliary transducer and replaced chlorine booster pump at well #1. <br />• Repaired chlorinators at well #1 and well #3. <br />• Repaired variable frequency drive and replaced leaking fluoride supply tank at well #2. <br />• • Installed interior piping and completed painting at well #4 booster station. <br />Completed MIU and meter change out program including the final 733 installations. <br />• 4,822 Gopher One locates. <br />• 129 water /sewer inspections. <br />• Repaired 21 hydrants. <br />• Replaced 43 valve boxes. <br />• <br />Paul asked if there were any disappointments in the year 2003. Rick responded that he was <br />disappointed in the quality of work done on the Highland Meadows trail. Otherwise he felt <br />everything went fairly well in 2003. <br />ADOPT MEETING CALENDAR FOR 2004: <br />Rick recommended the following 2004 Park Board meeting dates. He asked members to please <br />note the two Tuesday Meetings and that the September meeting will be the annual park tour and <br />BBQ: <br />Monday, January 5, 2004 <br />Monday, February 2, 2004 <br />Monday March 1, 2004 <br />Monday, April 5, 2004 <br />Monday, May 3, 2004 <br />Monday, June 7, 2004 <br />Tuesday, July 6, 2004 <br />Monday, August 2, 2004 <br />Tuesday, September 7, 2004 — Tour and BBQ <br />Monday, October 4, 2004 <br />Monday, November 1, 2004 <br />Monday, December 6, 2004 <br />Pat Huelman made a motion to approve the 2004 Park Board Calendar. It was seconded by Pam <br />Taschuk and approved. <br />RECREATION UPDATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.