My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/03/2004 Park Board Other
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2004 Park Board Packets
>
08/03/2004 Park Board Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:53:41 AM
Creation date
7/9/2014 8:53:00 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Other
Meeting Date
08/03/2004
Park Bd Meeting Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Layout and painting of lacrosse field (CMS #5) <br />o Poured concrete bench pads, installed benches at Behm's Park and Rice Lake Elementary <br />basketball courts. <br />o Installed Birch Park gazebo. <br />o Site preparation and seeded Birch Park gazebo and Behm's Park and Rice Lake <br />Elementary basketball courts. <br />o Applied second fertilizer application at Clearwater Creek and Highland Meadows Parks. <br />o Attended defensive driving training. <br />o Irrigation system maintenance and repair: <br />Replaced 50'+ of cracked zone line at Birch Park. <br />Repaired leaky quick coupler and raised valve boxes at Rice Lake Elementary <br />School. <br />Replaced damaged heads at Behm's, Marshan , and Rice Lake Estates Parks. <br />o Basketball court maintenance: <br />Touch -up painted court surface at Pheasant Hills Park. <br />Backboard repair (replaced missing hardware) and cleaning at Pheasant Hills <br />Park. <br />Cleaned backboards at other locations. <br />o Flail mowed trail edges. <br />o Trail repair: <br />Snow Owl Lane — saw cut and removed approximately 40' of bituminous trail, <br />rebased, compacted and installed new bituminous surface. <br />Near Ware Road — Saw cut and removed approximately 100' of sinking trail, <br />rebased, compacted, and installed new bituminous surface. <br />Pothole patch at Rice Lake Elementary School, Fawn Lane and Ware Road where <br />needed. <br />o Boardwalk repair: <br />Brandywood — replaced or redrove screws that were protruding from deck boards. <br />Shores of Marshan — replaced approximately 40 2 "x6 "x8' planks along this <br />section of boardwalk. <br />As I'm sure you are aware, as our trails and boardwalk systems age, more resources will be <br />needed to properly maintain them. Currently trail repair is running about $2 /ft2 that is just for the <br />bituminous install. Preparation work by staff (old bituminous removal, rebasing and <br />compacting) is not included in that cost. Cost for the two areas above (approximately 140') will <br />be approximately $2500, again this does not include staff time spent prepping these areas. <br />Boardwalk maintenance is not cheap either. Materials cost just to replace the planking at the <br />Marshan boardwalk would run approximately $8000.00. Again, that is planking only not <br />installed just some food for thought. <br />Those are the major highlights from June and July, more to come in August. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.