Laserfiche WebLink
• Infield renovation RLE #3. Removed lip, moved irrigation heads, added ag -lime. <br />• Soccer and football field layout, cut -ins and painting (14 soccer game and practice fields, <br />5 football fields. 3 game and 2 practice fields). <br />• Birchwood Acres Park <br />Irrigation power hooked up, system checked and adjusted. <br />Site and seed bed prep. <br />Seeded on August 18th and 19th. <br />Fertilized for the first time on August 30th. <br />• Applied fertilizer to approximately 40 acres of irrigated turf. (Second application of <br />season). <br />September, 2005 <br />• Mowing, mowing, and mowing. <br />••• Garbage <br />• Athletic field maintenance and game prep — Line mow -ins, painting, and net repair. <br />• Assisted Forestry Department with Oak Wilt control. <br />• Assisted Utility Department with hydrant flushing. <br />• Fertilized Birchwood Acres new seeding. (Second application.) <br />• Site prep and seeding Spirit Hills Lift Station. <br />Well, that is a quick recap of the past three months. The turf is coming in nicely at Birchwood <br />Acres Park. Check it out if you have an opportunity. <br />sw /parkbrd/Mike /July - August- September 2005 Park Update.doc <br />• <br />