My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/07/2005 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2005 Park Board Packets
>
11/07/2005 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:43:05 AM
Creation date
7/9/2014 10:02:51 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/07/2005
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />November 2, 2005 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: October Park Maintenance Update <br />Fall football and soccer programs officially came to a close this past weekend (October 29 -30). <br />We will spend the next couple of weeks topdressing and over seeding wear areas and then put <br />them to bed for the winter. <br />Maintenance highlights during the month of October has included: <br />❖ Mowing of all park areas. We may have to mow one more time, but the end of the <br />mowing season is definitely in sight. <br />❖ Garbage collection. <br />❖ Soccer and football field maintenance and game preparation including line mow -ins, <br />painting and net repair. <br />❖ Removed and stored soccer nets and goals. <br />❖ Core aerated football and soccer fields. <br />❖ Applied winterizer fertilizer to approximately 44 acres of turf. <br />• Highland Meadows — removed soil and old mulch from playground and basketball court <br />landscape beds, replaced with fresh mulch. <br />• Playground inspection and repairs as needed. <br />❖ Shenandoah Park playground — replaced burned S crawl tunnels on 2 -5 and 5 -12 play <br />structures (approx. $2400.00 in replacement parts). <br />❖ Birch Park hockey rink — brought in fresh Class V and re- leveled rink. We hope to re- <br />grade City Hall Park and Lino Park rinks before freeze up. <br />❖ Installed trunk guards and checked condition of young park trees. <br />❖ Irrigation system blowouts and repairs. <br />❖ Building cleanup and maintenance. <br />❖ Equipment cleanup and maintenance. <br />• Installed new gates and stop signs at trail entrance on east side of Rice Lake Elementary <br />School. <br />❖ Repaired damaged bleacher at CMS #2. <br />• Assisted Recreation Department with Family Turkey Shoot preparation. <br />IIIThose are October's major highlights, more to come in November. <br />Sw /parkbrd/Mike /October 05 Park Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.