My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/05/2008 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2008 Park Board Packets
>
05/05/2008 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 12:24:35 PM
Creation date
7/10/2014 9:32:31 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/05/2008
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />April 30, 2008 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Clearwater Creek Trail Project Update <br />During the 2008 Park Board goals discussion at the January Park Board meeting, staff was <br />directed to further refine the estimated project costs to complete the trail along the northern edge <br />of Clearwater Creek from Otter Lake Road to Hugo's trail system. The preliminary engineer's <br />estimate provided at the January Park Board meeting provided preliminary construction costs of <br />$21,000. This included mobilization, aggregate base, wear coarse, topsoil borrow, and silt fence. <br />• A recent on -site visit identified some issues that staff will need to further investigate: <br />• The wetland area north of the eastern portion of the proposed trail drains into Clearwater <br />Creek. We will work with RCWD to identify the number /size /locations of culverts so we <br />don't interrupt the flow. <br />• The eastern portion of the proposed trail appears to skirt possible wetland areas. We will <br />contact RCWD to explore options (ie. asphalt trail vs. boardwalk) <br />• The original proposed trail alignment was placed along the northern side of the pond <br />(directly east of Otter Lake Road). It appears that locating the proposed trail between the <br />pond and Clearwater Creek is a better option from an economic, environmental, and trail <br />user experience standpoint. <br />Staff will address these issues and report back to the Park Board for consideration. It is <br />anticipated that actual construction costs will exceed the preliminary estimated construction costs <br />discussed at January's meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.