My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/01/2008 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2008 Park Board Packets
>
12/01/2008 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 12:23:30 PM
Creation date
7/10/2014 9:39:56 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
12/01/2008
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino-lakes.mn.us <br />November 24, 2008 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: Park Maintenance Update — May - November <br />WOW — has it really been 7 months since my last update? Sorry about that. I think I will just <br />give you a short month by month recap and I will try to get back to the monthly schedule starting <br />in December. <br />May: <br />➢ Athletic field maintenance and game preparation. (softball, baseball, soccer, and <br />lacrosse). <br />➢ Planted 40 bare root trees at various park locations. <br />➢ Completed irrigation system start ups and repairs. <br />➢ Cleaned up perennial and shrub beds and applied pre- emergent weed control. <br />➢ Renovated Birch Park Building exterior. Removed existing siding and windows, <br />replaced with new. <br />➢ Modified and painted three sets of soccer goals to accommodate quick clip net system. <br />➢ Memorial Day storm cleanup. Approximately two weeks of storm cleanup. <br />June: <br />➢ Fertilized approximately 45 acres of athletic fields and irrigated turf. <br />➢ Pheasant Hills Trail — Completed connections on both sides of new boardwalk Haul and <br />grade fill, blacktop on each side to existing trail, restore and seed edges. <br />➢ Playground inspections and repairs. <br />➢ Removed observation deck at Pheasant Hills. <br />July: <br />➢ Cleaned and re- mulched shrub beds and trees at Clearwater Creek. <br />➢ Trail pruning for side and overhead clearance. <br />➢ Replaced wooden planks on park benches at various locations. <br />➢ Weed control on trails. <br />➢ Organized, set -up and used new bucket truck. <br />August: <br />➢ Soccer and football field layout. <br />➢ Prime and paint Birch Park building exterior. <br />➢ Prime Sunrise Park building exterior. <br />➢ Playground inspections and repairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.