My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-04-2009 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2009 Park Board Packets
>
05-04-2009 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 12:21:27 PM
Creation date
7/10/2014 9:50:26 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/04/2009
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />May 1, 2009 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Proposed Eagle Project at Arena Acres Park <br />Mr. Hunter Hallstrom has approached the city to consider the placement of a "pergola" type <br />structure at Arena Acres Park for his Eagle Scout Project. Included in Mr. Hallstrom's proposal <br />(attached 5 -1 to 5 -7) is an aerial shot of the proposed site, materials required, and schematic <br />views from the top, side and front. <br />Background <br />Arena Acres Park (519 Andall Street) is a one acre park consisting of two tennis courts, <br />basketball court, and small playground structure (attached 5 -9). This park has not been master <br />planned. <br />The proposed project consists of using green treated wood. This simple design consists of <br />placing 6x8 boards spaced 1' across (attached 5 -4). We need to be sure the end product is <br />visually appealing and well constructed. Perhaps Mr. Hallstrom can consider designing a more <br />visually appealing project such as the example attached (5 -10). Since the city is ultimately <br />responsible for the end result we need to make sure that this project will fit our standards from an <br />aesthetic, on -going maintenance, and liability stand point. <br />Staff Recommendations <br />• Concrete slab extends one foot beyond all edges of the pergola. <br />• Cedar wood used instead of green treated. <br />• Consider more visually appealing design for pergola. <br />• Have Inspections Department review construction drawings. <br />The actual location can be done on site with Mr. Hallstrom. This project will necessitate the <br />removal of some brush which staff can take care of. Staff can also take care of the concrete <br />work, realigning the playground border, and installing additional fibar (safety surface). Perhaps <br />the Park Board can consider dedicating some funds to help cover any increased costs associated <br />with providing a more elaborate structure. <br />sw /parkbrd /meeting info /Hallstrom Eagle Scout Project.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.