Laserfiche WebLink
July 2009 <br />• Trail trimming for clearance. <br />• Watered young trees and shrubs. <br />• Adjusted and repaired all gates at Centennial Middle School. <br />• Repaired Behm's backboard. <br />August 2009 <br />• Fall athletic field layouts, painting and preparation. (Move goals, hang nets and anchor <br />goals). <br />• Fertilizer application. <br />• Paint Behm's irrigation shed. <br />• Marshan boardwalk repairs. <br />• Installed memorial bench at Marshan Park. <br />• Pergola installed at Arena Acres Park. (Eagle Scout Project) <br />September 2009 <br />• Sod cut and mulched young park trees. <br />• Assisted Environmental Department with Oak Wild Control. (V -plow) <br />• Athletic field maintenance and line painting. <br />• Playground inspection and repairs. <br />• Hazard tree removal — trails and parks. <br />October 2009 <br />• Irrigation blowouts and repairs. <br />• Trail trimming and edging for overlays. <br />• Ash tree inventory of our parks in anticipation of EAB (Emerald Ash Borer) arrival. <br />• Marshan Park Building — Exterior renovation. Remove and replace 2 large front <br />windows, replace soffit, fascia, siding and painted building. Hope to have completed <br />early November. <br />There it is quick and to the point. More to come in November. <br />sw /parkbrd /mike /March — October 2009 Park Maintenance Update.doc <br />• <br />