My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-07-2011 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2011 Park Board Packets
>
02-07-2011 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 12:17:26 PM
Creation date
7/10/2014 10:15:21 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/07/2011
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shrubs, installed fresh mulch, repaired damaged irrigation system and graded and seeded <br />where needed. <br />Summer <br />• Playground inspections and repairs. <br />o Replaced vandalized spiral slide at Birch Park (insurance claim). <br />o Replaced two damaged 90° curved slides at Birch Park. <br />o Replaced rope climbing wall at Behm's Park. <br />o Replaced rope climbing wall at Marshan Park. <br />• July Storm Cleanup. <br />o Removed storm damaged trees and branches from city streets, trails and parks. <br />o Sunrise shelter #2 roof damage - removed tree and removed damaged roof. <br />(insurance claim). <br />Fall <br />• Fall soccer and football field layout and painting. Moved and anchored soccer goals. <br />• Poured concrete pad and installed memorial bench along trail in South Reshanau Lakes <br />Estates Development. <br />• Installed three dog -i -pot pet stations. <br />o Timberwolf Trail — city trail connecting with regional park. <br />o South Reshanau Lakes Estates Trail. <br />o Behm's Park. <br />These are being heavily used and we have received many positive comments from <br />dog owners. <br />• Ballfield improvement projects. <br />o Sunrise #1 - edged and graded infield. Replaced 1St and 3rd out of play fence with <br />new. <br />o Sunrise #2 - replaced 1St and 3rd out of play fence with new. <br />o Sunrise #4 - replaced 1st and 3rd out of play and players bench fencing. Installed <br />fence guard underneath. <br />Winter <br />• Hockey rink repairs. <br />• Daily rink maintenance, sweeping, blowing, shoveling and flooding. <br />• Snow plowing of city streets, trails, sidewalks and parking lots. <br />• Equipment maintenance and repairs. <br />• Building maintenance and repairs. <br />Those are the major highlights of 2010 and January 2011. <br />Sw /parkboard /mike/ Spring 2010 — January 25 -, 2011 Park Maintenance Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.