Laserfiche WebLink
- Applied fall fertilizer to irrigated turf sites. <br />- Playground repairs — <br />Replaced vandalized slides at Pheasant Hills, Marshan, City Hall and Clearwater <br />Creek Parks. <br />Added certified playground mulch to Clearwater Creek playground. <br />Prepped and poured 17'x25' concrete pad for City Hall shop. <br />October 2011 <br />- DNR Community Forest Bonding Grant — <br />Parks Department staff removed approximately 60 4 " -8" boulevard Ash Trees in <br />the Highland Meadows Development. Eighteen Princeton American Elms were <br />replanted, mulched and staked. Next spring 2012 we will complete the <br />replacements with 3 additional species (Hackberry, N. Pin Oak and Bicolor Oak) <br />totaling 42 trees. <br />- Added certified playground mulch to Lino Park playground. <br />- Attended 1st Aid/CPR/AED training. <br />- Winterized all irrigation systems. <br />- Prepped hockey and pleasure rinks. <br />- Attended winter maintenance of parking lots and sidewalk training. <br />- Crack filled along Birch Street trail. <br />November 2011 <br />Assisted Recreation Department with Family Turkey Shoot setup and cleanup and <br />football equipment storage. <br />- Prepped and poured sidewalk at Town Center. <br />- Removed soccer goals and nets from fields. <br />- Prepped and stored equipment for winter. <br />- Conducted prescribed burns at several locations. <br />Those are the highlights for this summer and fall. <br />• <br />