My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/27/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
01/27/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 12:58:38 PM
Creation date
7/10/2014 11:46:56 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/27/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />ATTACHMENT A <br />First reading of Ordinance 04 -03. <br />Revisions to Subdivision Ordinance Draft of December 19, 2002. These revisions are to <br />be incorporated into the approval of the first reading of the ordinance. <br />Changes are shown in boldface Arial font. Added text is underlined, deleted text is <br />in stFikeewt. Other text is shown as it appears in the December 19 draft. <br />• page 1001.3 Section 1001 -7 DEFINITIONS <br />The definitions will be further compared with those in the draft zoning ordinance to <br />ensure consistency. Revised definitions will be ready for the second reading of this <br />ordinance. <br />• page 1004.8 Section 1004 -1 -9 Additional Information Required <br />1. Evaluation by the applicant that the subdivision would not be determined <br />to be premature pursuant to the criteria outlined by the Comprehensive <br />Plan and Subdivision Ordinance. <br />2. Phasing Plan. All preliminary plats shall include, if applicable under <br />the growth management policy, a phasing plan that includes: <br />a. A phasing plan identifying the sequence of development and <br />approximate areas, number of lots in each phase, total area and <br />buildable area per phase, serially numbered with a description of <br />each phase. Information shall be provided regarding the number of <br />dwelling units, proposed improvements, and common facilities for <br />each. Each phase of a preliminary plat shall be consistent with <br />growth management criteria of the City. <br />b. Any trail/sidewalks within the approved phase of the preliminary <br />plat shall be constructed along with streets and utilities and shall be <br />clearly marked on a site map which shall be an attachment to all <br />sales agreements for individual lots. <br />c. A site grading plan that is coordinated with the phasing plan to <br />avoid premature disruption of land or long term storage of excess <br />materials. Plans for the construction of streets and <br />facilities for sanitary sewer and water also must take <br />into consideration the phasing plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.