Laserfiche WebLink
• <br />• <br />• <br />F.wRrs <br />nxr <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />s i r ai <br />A <br />A <br />A <br />9002 <br />1700Z <br />t700Z <br />A <br />1700Z <br />EOOZ <br />Implement the Plan and Train Employees <br />The necessary repair and maintenance should be <br />completed in the same year as the inspection or, <br />if impracticable, be incorporated into the next <br />year's work plan. Such maintenance should be <br />discussed in the NPDES Phase II General Permit <br />annual report. <br />Continue a priority and budgeting system for <br />sweeping public parking lots and streets at least <br />twice a year. _ <br />Develop or refine standard construction <br />requirements, access standards and maintenance <br />easements, maintenance covenants including <br />inspection, maintenance, repair and sweeping of <br />parking lots and private roads at least twice a year <br />and require reports for inclusion in NPDES Phase <br />II General Permit annual reports. Also develop an <br />inspection program. <br />Train City employees to implement the Plan. <br />Annual Water Resource Infrastructure Inspection <br />Plan <br />Implement Water Resource Infrastructure Inspection <br />Plan <br />Infrastructure Repair and Maintenance <br />Public Parking Lot and Street Sweeping <br />Privately Constructed Water Resource Infrastructure <br />Performance Plan. <br />Privately Constructed Water Resource Infrastructure <br />Performance Implementation. <br />gam= <br />tAaq <br />snvuw.so el-ou!I io ©eleyoa6w - llew3 <br />660Z-Z96-659 - xed <br />LZiZ-Z96-659 - auogd <br />b1.05S elosauum saNei ou ' (en e JelL180 umo 1009 <br />JopoaJia luawdoIanaa Iiunwwoa `eieyooao iaeyoiW <br />