Laserfiche WebLink
e. As built survey must be submitted and approved by City Engineer. <br />These items need to be completed within six (6) months of the issuance of the certificate of occupancy <br />(weather permitted). If the builder has not called for the escrow inspection by six months, the city will <br />automatically do the inspections. Once the request for an inspection has been made, the city will return the <br />escrow within 30 days after last inspection has passed <br />8. Easement Encroachment Fee $30.00 <br />9. Fence Permit $30.00 <br />10. Sign Permit <br />11. All Residential Mechanical Permits, (except new construction and air conditioning <br />12. Residential New Construction Mechanical Permit <br />13. Residential Air Conditioning Permit 1% of the contract price ($15.00 minimum fee) <br />14. Commercial Mechanical Permit 1% of the contract price ($25.00 minimum fee) <br />15. Manufactured Home Permits $90.00 <br />16. Plumbing Permit $9.00 per fixture ($15.00 minimum fee) <br />17. Sewer Connection Fee <br />018. Water Connection Fee <br />19. Contractor License Verification <br />20. SAC (Sewer Availability Charge) <br />21. 3/4" Water Meter <br />22. 1" Water Meter <br />23. MXU Unit <br />Fee Table <br />$25.00 <br />$60.00 <br />$100.00 <br />$125.00 <br />$5.00 per permit <br />per Met Council <br />$290.00 <br />$325.00 <br />$125.00 <br />$75.00 <br />$5.00 <br />24. Septic Installation or Repair Permit <br />25. Septic Pumping Permit <br />• <br />*Inspections made out side of normal business hours is a three -hour minimum charge <br />* *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />** *Actual costs include administrative and overhead costs. <br />supervision, <br />