My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/28/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
04/28/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 3:27:22 PM
Creation date
7/11/2014 10:37:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/28/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />AGENDA ITEM 7E <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: April 14, 2003 <br />TOPIC: Resolution No. 03 - 48, Authorizing Feasibility Study for Lift Station, <br />Century Farm North <br />Vote Required: Simple Majority <br />BACKGROUND: <br />As the City utility service areas expand, the City must install infrastructure to <br />allow for future growth. The area of the Century Farm North subdivision will <br />require a sanitary sewer lift station to service the development and the <br />surrounding area. It will be necessary to specifically study this service area to <br />accurately determine future sewage flow rates. <br />A feasibility study will define the proposed pipe invert and forcemain elevation for <br />the lift station, the sizing of the forcemain pipe, the structure size, and the pump <br />sizing requirements. The location of the lift station within the development will <br />also be reviewed. <br />Design considerations and recommendations will be provided that will consider <br />phasing and upgrades as the service area ultimately develops. <br />The budget for this study is $5,600.00 and will be paid by the developer. Upon <br />completion of the study, percentages of costs will be defined regarding the <br />portion of the lift stations oversizing to address the total service area. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 03 - 48, authorizing the feasibility study for lift <br />station, Century Farm North. <br />3. Not adopt Resolution Number 03 — 48. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution Number 03 - 48 be adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.