My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/14/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
07/14/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 2:48:40 PM
Creation date
7/11/2014 1:27:11 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff5EH <br />July 10, 2003 <br />3535 Vadnais Center Drive, St. Paul, MN 55110 -5196 651.490.2000 651.490.2150 FAX <br />architecture engineering • environmental • transportation <br />Mr. Mike Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 -1182 <br />Dear Mr. Grochala: <br />RE: Lino Lakes, Minnesota <br />Lakes Business Park EAW <br />Summary of Document Changes <br />SEH No. A- LINOL0306.00 14.00 <br />After meeting with the City's Environmental Board on Wed nesday, July 9, 2003, the draft EAW for <br />the Lakes Business Park will be modified as follows: <br />1. An additional figure will be included. The figure represents the existing MLCCS data for the <br />site. Figure numbers will be adjusted to account for the additional figure. <br />2. Question #10 (cover types): <br />Acreage calculations will be modified for before and after categories of each cover type. <br />3. Question #11 (Fish, Wildlife...): <br />Narrative will be modified to indicate the project site has marginal wildlife habitat, as cited in <br />the City's Wild Urban Interface Study. <br />4. Question #12 (Physical impacts on water resources): <br />Narrative will be modified to indicate that all storm sewers will be routed through onsite holding <br />ponds and /or infiltration basins. <br />5. Question #17.a (Water quality: surface water runoff): <br />Narrative for the second paragraph will be modified to clearly show that surface water runoff is <br />to be managed onsite. <br />6. Question #25 (Nearby resources): <br />Narrative will be modified to include reference to a letter received from the State Historic <br />Preservation Office (SHPO). <br />7. Question #26 (Visual impacts): <br />Narrative will be deleted in its entirety. <br />Please call me at 651.490.2147 if you have questions. <br />Sincerely, <br />fri,rAg(/ <br />Robert L. Moberg, PE <br />Project Manager <br />nm <br />\lspfiles I \spli\ko \liuol\ 030600 \corres \grochala071003.doc <br />Short Elliott Hendrickson Inc. <br />• Your Trusted Resource • Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.