My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/14/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
07/14/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 2:48:40 PM
Creation date
7/11/2014 1:27:11 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7Bii <br />• STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: July 14, 2003 <br />TOPIC: Resolution No. 03 -98, Accepting Bids and Awarding Construction <br />Contract, Elm Street Reconstruction <br />VOTE REQUIRED: 3/5 Vote Required <br />BACKGROUND: <br />Sealed bids were received and publicly opened at 10:00 a.m. on June 3, 2003. The <br />results of the bid opening are presented below. City Council action is required to award <br />a construction contract to the lowest responsible bidder. <br />Contractor Amount of Bid <br />F.M. Frattalone $1,513,221.79 <br />Arcon Construction $1,515,506.97 <br />Barbarossa & Sons, Inc. $1,576,445.70 <br />Northdale Construction $1,738,903.49 <br />Friedges Contracting $1,770,639.24 <br />S.R. Weidema, Inc. $1,806,800.30 <br />Engineer's Estimate $1,475,461.00 <br />The low bid is approximately 3% over the Engineer's Estimate for this project. A copy of <br />the complete bid tabulation is attached. This 3% overage falls within the 10% <br />contingency budgeted for the project. <br />The substantial completion date for this project is November 15, 2003, with a final <br />completion date of June 6, 2004. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 03 -98, Accepting Bids and Awarding a Construction <br />Contract to F.M. Frattalone for the Elm Street Reconstruction project. <br />3. Not adopt Resolution No. 03 -98. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends adoption of Resolution Number 03 -98. <br />
The URL can be used to link to this page
Your browser does not support the video tag.