My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/08/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
09/08/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 5:01:45 PM
Creation date
7/14/2014 12:05:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />• ENGINEERS • ARCHITECTS • PLANNERS <br />• <br />MEMORANDUM <br />To: James Studenski, City Engineer Reference: Hailey Manor <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Copies To: City of Lino Lakes, Minnesota <br />From: Scott A. Brink <br />Date: August 26, 2003 <br />Comm. No. 12701 -002 <br />Routing: <br />A review memorandum dated July 1, 2003 was previously submitted to the City for this proposed <br />development. Revised comments are provided based on the following: <br />1. Revised Grading and Erosion Control, and Stormwater Management Plans dated June 24, 2003, and <br />subsequently revised July 31, 2003. <br />2. Revised HydroCad Drainage Calculations for 2 yr., 10 yr., and 100 yr., events (Existing and <br />Developed Conditions), dated June 19, 2003. Subsequent revised calculations dated July 30, 2003, <br />including 10 -day snowmelt calculations have also been received. <br />3. A Geotechnical Study prepared by STS Consultants, dated July 1, 2003. <br />4. A copy of a FAX Transmittal from RCWD (Emmons & Olivier Resources) to Frank Feela and Paul <br />Kroehnert dated July 11, 2003. <br />5. Letter from Metro Land Surveying to the City of Lino Lakes, dated August 4, 2003 addressing <br />previous review comments of the Rice Creek Watershed District (RCWD) and TKDA. <br />Comments are as follows: <br />Project Overview <br />The proposed plans provide for a preliminary plat and the construction of residential units on property <br />located at the intersection of Lois Lane and Country Lane. Essentially, the proposed project consists of the <br />following: <br />1. The dividing of a single 1.02 acre parcel into two lots at the southwest comer of the intersection of <br />Lois Lane and Country Lane. One existing home is proposed to remain. <br />2. The dividing of three existing parcels into 12 lots on 3.35 acres of property located between Lois <br />Lane and Arlo Lane. Three existing homes are proposed to remain. <br />General Comments <br />• 1. A complete set of revised plans (final construction plans) must be received. <br />2. General Notes on the grading and utility plans must be numbered. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.