My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/08/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
09/08/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 5:01:45 PM
Creation date
7/14/2014 12:05:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruggeman <br />page 11 <br />Turning Movement Volumes <br />P.M. Peak Hour <br />total <br />pre- existing <br />(URS study) <br />total with <br />Spirit Hills <br />commercial <br />(URS study) <br />added by <br />Bruggeman <br />(TKDA study) <br />south -bound Hodgson <br />left turn onto east Birch <br />412 <br />502 <br />straight south on Hodgson <br />135 <br />99 <br />north -bound Hodgson <br />28 total <br />right turn onto east Birch <br />228 <br />223 <br />straight north on Hodgson <br />348 <br />383 <br />west -bound on Birch <br />turn right onto north Hodg. <br />356 <br />335 <br />21 <br />turn left onto south Hodg. <br />150 <br />191 <br />25 <br />The Anoka County Highway Dept. reviewed the Spirit Hills commercial project and the <br />Bruggeman project in November and supported the signalization and turn lanes for the <br />intersection. Anoka County subsequently provided a design for roadway improvements <br />to accommodate both projects. The improvements will include: <br />• traffic signals at Birch and Hodgson <br />• Hodgson southbound through lane <br />• left turn lane from southbound Hodgson to eastbound Birch <br />• Hodgson northbound through lane <br />• right turn lane from northbound Hodgson to eastbound Birch <br />• right turn lane from westbound Birch to northbound Hodgson <br />• left turn lane from westbound Birch to southbound Hodgson <br />• right turn lane into the project from northbound Hodgson at the Hodgson access <br />left turn lane into the project from southbound Hodgson at the Hodgson access <br />• right turn lane into the project from eastbound Birch at the Birch access (right-in- <br />right-out only) <br />• right turn lane from eastbound Birch to southbound Ware <br />• left turn lane from eastbound Birch to northbound Ware <br />• Birch eastbound through lane at Ware <br />• right turn lane from westbound Birch to northbound Ware <br />• left turn lane from westbound Birch to southbound Ware <br />Birch westbound through lane at Ware <br />As part of the project approval, Bruggeman and the developer of Spirit Hills commercial <br />will cooperate with the County and City to finance these improvements. A feasibility <br />study, paid for by the two developers, is underway. The City Engineer has worked with <br />the Anoka County Highway Dept to determine the specific improvement details. Costs <br />have yet to be determined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.