My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/22/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
09/22/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 2:06:43 PM
Creation date
7/14/2014 1:13:37 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/22/2003
Council Meeting Type
Joint
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />VI. BUILDING PERMITS <br />A. The Developer agrees that building permits may be issued upon approval of <br />the Final Plat by the City Council at which time all required Financial <br />Security shall be in place with the City. <br />B. The Developer further agrees that City_ Sewer, Water, Storm Sewer, and <br />Bituminous Base Construction of the Streets, temporary street signs, gas, <br />electric, and telephone will be completed prior to the issuance of building <br />permits for Lots 1,3 & 4, Block 1. <br />C. The Developer further agrees that an as-built survey certifying that all the <br />grading complies with the grading plan prior to issuance of building permits. <br />D. Each lot must comply with erosion control measures to prevent any material <br />from leaving the lot. The City of Lino Lakes will not perform any requested <br />inspections on the lot until it complies to the erosion control requirements. <br />E. Each lot must have a City approved Certificate of Grading showing the as- <br />built survey prior to an issuance of a Certificate of Occupancy. It shall be <br />the responsibility of the Developer, its purchasers, builders or contractors to <br />ensure compliance with the grading plan. <br />VII. HOURS OF CONSTRUCTION ACTIVITY <br />A. All construction activity shall be limited to the hours as follows: <br />Monday through Friday 7:00 a.m. to <br />7:00 p.m. Saturday <br />9:00 a.m. to 5:00 p.m. Sunday and <br />Holidays No working hours allowed <br />VTTT. OWNERSHIP OF IMPROVEMENTS <br />A. Upon completion of the work and construction required by this contract and <br />acceptance by the City, the improvements lying within the public easements <br />shall become City property without further notice or action. <br />IX. INSURANCE <br />A. Developer or all its subcontractors shall take out and maintain until one (1) <br />year after the City has accepted the Developer Improvements, public liability <br />and property damage insurance covering personal injury, including death, <br />and claims for property damage which may arise out of the Developer's <br />work or the work of his subcontractors or by one directly or indirectly <br />
The URL can be used to link to this page
Your browser does not support the video tag.