My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
10/13/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 1:40:09 PM
Creation date
7/14/2014 2:55:16 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 13, 2003 City Council <br />Apollo Center <br />This review is based upon information contained in the following documents. <br />1. Drainage Calculations dated June 23, 2003 <br />2. Storm Sewer Design Drainage Area Plan dated June 24, 2003, prepared <br />by Schoell & Madson, Inc <br />3. Grading, Drainage & Erosion Control Plan, dated October 2, 2003, <br />prepared by Schoell & Madson, Inc <br />4. Utility Plan, dated October 2, 2003, prepared by Schoell & Madson, Inc <br />5. Floor Plan, dated October 2, 2003, prepared by Faulkner Construction, <br />Inc. <br />6. Exterior Elevations, dated October 2, 2003, prepared by Faulkner <br />Construction, Inc. <br />7. Certificate of Survey, received by the City June 24, 2003, prepared by <br />Schoell & Madson, Inc <br />8. Photometric Plan, received by the City June 17, 2003, prepared by Luma <br />Sales Associates. <br />9. Site /Landscape Plan, October 2, 2003, prepared by Faulkner <br />Construction, Inc. <br />ANALYSIS <br />Land Use and Zoning <br />Location <br />Site <br />West <br />North <br />East <br />South <br />Guided Land Use Existing Zoning <br />Commercial <br />Industrial <br />Commercial <br />Commercial <br />Commercial <br />General Business <br />Light Industrial <br />General Business <br />General Business <br />General Business <br />The uses as proposed are consistent with the zoning of the area, and the <br />auto repair facility is a conditional use in the General Business District. <br />Setback Requirements <br />Principle Building <br />From Arterial Street <br />From Local Street <br />From Residential <br />District <br />Side Yard <br />Rear Yard <br />Required <br />40 Feet <br />30 Feet <br />35 Feet <br />10 Feet <br />30 Feet <br />Proposed <br />130 Feet <br />40 Feet <br />10 Feet <br />30 Feet <br />Parking Lot <br />Required <br />15 Feet <br />15 Feet <br />35 Feet <br />10 Feet <br />10 Feet <br />Proposed <br />40 Feet <br />40 Feet <br />10 Feet <br />30 Feet <br />The building as proposed meets the setback requirements of the General <br />Business District. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.