My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/27/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
10/27/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 1:27:56 PM
Creation date
7/14/2014 3:36:00 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/27/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract <br />Ravens Hollow <br />• into a contractual agreement on the rate and maintenance of the <br />street lighting system. <br />• <br />b) It shall be the responsibility of the Developer to pay for street <br />lighting operation charges for the initial 15 months of operation of <br />the system. <br />13. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, all permanent or temporary easements necessary for <br />the construction and installation of the Developer Improvements. All such <br />easements required by the City shall be in writing, in recordable form, <br />containing such terms and conditions as the City shall determine. <br />14. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />Regional and Local jurisdictions prior to the commencement of site grading <br />or construction and prior to the City awarding construction contracts for <br />public utilities. <br />15. The Developer shall make provision that all gas, telephone, cable TV and <br />electric utility designs be submitted to the City for review and approval prior <br />to construction of the streets. Following review and approval by the City, <br />the Developer shall insure that all installations comply with applicable City, <br />County and State design standards and show proof of security arrangements <br />with said utility companies. <br />16. Cost of Developer Improvements, description and completion dates are as <br />shown on Attachment A. <br />17. Construction of Developer's Improvements: <br />a) The construction, installation, materials and equipment shall be in <br />accordance with the plans and specifications approved by the City. <br />b) All of the work shall be under and subject to the inspection and <br />approval of the City and, where appropriate, any other governmental <br />agency having jurisdiction. <br />c) The Developer shall obtain final plat approval prior to the <br />installation of the sanitary sewer, watermain, storm sewer, and <br />streets. Prior to acceptance of Developer Improvements by the City, <br />the Developer shall record the final plat which will dedicate all <br />permanent easements necessary for the construction and installation <br />of the Developer and City Improvements as determined by the City. <br />d) All construction debris and trash shall be properly disposed of at the <br />Developer expense and in a timely manner as determined by the <br />City. <br />page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.