Laserfiche WebLink
Planning & Zoning Board <br />February 13, 2001 <br />Page 10 <br />G. Ryan Companies, Summit Fire Protection, 2XX Apollo Drive, Minor <br />Subdivision and Site Plan Review. <br />Staff presented the application for Ryan Companies on behalf of Summit Fire Protection, <br />which was requesting a minor subdivision and plat approval to allow the construction of a <br />30,076 square foot office /warehouse facility on the property located in the 200 block of <br />Apollo Drive. The site plan also illustrated 22,800 square foot future expansion and <br />parking for this expansion. <br />Staff presented its analysis by explaining the site's L -1, Light Industrial zoning <br />classification was consistent with this land use designation. The lot, parking and building <br />met all of the performance standards in the L -I, Light Industrial District. Staff stated <br />applicant was proposing to construct a 30,076 square foot office /warehouse facility. The <br />building was considered one story; however, the office and warehouse portions would <br />have different heights. All heights conformed to the 45 -foot future expansion along with <br />future parking. The building exterior materials conformed to the City Code. The plan's <br />indicted all trash and recycling containers would be stored inside the principal structure. <br />With respect to lighting, the plans did not include a detailed photometric plan. The site <br />plan showed shoebox light fixtures both on the building and in the parking area. Staff <br />recommended a condition of approval required the applicant to submit a detailed <br />photometric plan prior to City Council review. <br />Staff stated signage was governed by the City's sign Ordinance and separate permits were <br />required for all signs. The landscape plan presented a variety mix of landscaping. Most <br />notably, the applicant's plan called for a native mix of prairie grasses and wild flowers <br />throughout the site. The applicant must submit a maintenance plan for the native prairie <br />grasses. The applicant should add screening along the western side of the site to screen <br />the loading areas of the adjacent residential use. In addition, should applicant decide to <br />construct parking stalls in the future along the western side of the site, they would need to <br />add landscaping to screen it from the adjacent residential use. Utilities would come from <br />the existing sewer and water mains constructed as part of the Marmon/Keystone site to <br />the east. Water access would be stubbed across Apollo Court and split to serve both <br />Summit Fire Protection site and the parcel to the north. Storm water runoff from the <br />subject property would be stored and treated on site. The applicant's parking plans called <br />for 48 stalls and another 27 future stalls. If the proposed addition were constructed, it <br />would need 10 additional stalls. Together, the proposed and future parking exceeded the <br />total number of off - street parking stalls required by the Ordinance. <br />Mr. Corson asked if applicant wanted to make comment. <br />Frank Zelle, Ryan Companies Project Manager, presented color diagrams showing the <br />project. He stated with the 32 -foot wide drive, it would make it easier for service <br />vehicles to get in and out. He stated this was a cul -de -sac and it would not interfere with <br />anything by having a wider driveway. <br />Chair Schaps inquired about the native prairie grass. Mr. Zelle replied the front and side <br />of the building would be sod, with the rest of the area native prairie grass. <br />• <br />• <br />• <br />