Laserfiche WebLink
Planning & Zoning Board <br />June 13, 2001 <br />Page 15 <br />Staff stated the School District would need to submit an application for conditional use permit to <br />allow a school in the PSP District per Section 9.I.1 of the Lino Lakes Zoning Ordinance. <br />Staff stated applicant had submitted a survey and concept plan with the subdivision request. In <br />review of this information, staff offered the following comment/suggestions: <br />1. The site exceeds the lot area for a PSP lot. <br />2. The site fails to provide for adequate lot width, frontage on a public street, or setback <br />from the south and west property lines. <br />3. A wetland delineation is necessary for site development based on information submitted <br />with the Lake Business Park preliminary plat. The eastern portion of the site had wetland <br />constraints that must be addressed in the site design. Any wetl ng would require a <br />wetland replacement plan. <br />4. The survey indicated that only the eastern half of 4 <br />accommodate the proposed development, the balan <br />be vacated. <br />een vacated. To <br />through the site must <br />5. A utility easement following the 4th Street align ust be established and recorded. <br />• The subdivision should also show ten f. • ge an utility easements along the side <br />and rear property lines. <br />Staff indicated to avoid the need for lo <br />creation of a new lot, staff recomme <br />middle school site to create a sin <br />to utilize middle school land to <br />ing setback variances associated with the <br />roposed site be combined with the existing <br />bining the lots will allow the elementary school <br />City '' performance standards. <br />Staff stated Section 3.C.3 0 <br />building on PSP lots provide <br />met. <br />ino t "'. es Zoning Ordinance allowed more than one principal <br />all the performance standards of the Zoning Ordinance were <br />Staff indicated the site s within the existing MUSA. The proposed site and school was not <br />anticipated to overburde existing in -place utilities or municipal services. <br />With respect to transportation, staff explained the elementary school would gain its site access <br />via shared driveways with the middle school accessing Elm Street. The combined campus would <br />allow the middle school and elementary school to share bus service. The elementary school <br />would be designed to accommodate between 750 and 1,000 students, resulting in staffing of <br />approximately 75 people. Bus traffic, staff and visitor traffic would be the anticipated traffic <br />generation. This traffic was not anticipated to overburden existing streets serving the site. <br />Mr. Lyden made a MOTION to recommend approval of the requested rezoning from L -I to PSP <br />• <br />based on the following findings: <br />1. The elementary school site is combined with the middle school site to create a single lot. <br />