My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/11/2001 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2001
>
09/11/2001 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:47:36 AM
Creation date
7/15/2014 11:49:23 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
09/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Planning & Zoning Board <br />September 11, 2001 <br />Page 19 <br />Environmental Board include some Eastern Red Cedars and a row of Pines on the south side of <br />the proposed building. <br />Staff explained while the site plan illustrated an existing fence along I -35W, it did not indicate <br />whether or not any new fencing was to be provided on site. In review of the site plan, it was <br />suggested that fencing be provided in the following areas: <br />• Along the east side of the play fields to prevent stray balls from entering the <br />adjacent wetland. <br />• Along the sides of the play areas (north and west of the school) which border the <br />bus parking lot. <br />Staff indicated as shown on the submitted site plan, two play fields had been proposed east of the <br />elementary school. The southerly play field was also to be utili oftball field. As <br />mentioned previously, the softball field was not to be illuminated. <br />Staff stated Loading activities were to occur on the east si <br />provided ample area for service vehicle maneuvering <br />plantings (proposed to the north and south of the drive lane). <br />Staff indicated as depicted on the site plan, a wed <br />Rice Creek Watershed District had reviewed th <br />with authorization for administrative action <br />information. <br />mg. The area was <br />reened via evergreen <br />the eastern area of the site. The <br />mission and had recommended to table <br />A) subject to the receipt of certain <br />Staff stated a grading/drainage plan �� -a a` ad been submitted for review. <br />As noted on the utility plan, <br />The acceptability of this co <br />subject to review and app o <br />sed b i ilding encroached on an existing utility easement. <br />as the grading/drainage plan and utility plan should be <br />the t "ty Engineer. <br />Staff stated it also sho ot- ' that the Environmental Board had recommended that the area <br />on the western side of t',us . parking lot be considered for infiltration purposes. <br />Staff recommended app •val of the site and building plan/conditional use permit to allow the <br />construction of an elementary school in a PSP, Public /Semi - Public zoning District. The <br />recommendation was based on the findings contained in this report and subject to the conditions <br />listed below. <br />1. The elementary school site is combined with the middle school site to create a single lot. <br />2. A site plan is submitted which encompasses the entire middle school/elementary school. <br />3. The area on the western side of the bus parking lot be considered for infiltration purposes. <br />4. The landscape plan is revised to specify the variety of each individual planting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.