My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/10/1999 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1999
>
11/10/1999 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:31:03 AM
Creation date
7/15/2014 1:28:00 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
11/10/1999
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />November 10, 1999 <br />Page 7 <br />Mr. Dunn stated the complex may not become a reality if the citizens don't approve the <br />referendum. He stated he does not have anything against the church. He indicated he <br />would feel more comfortable if there were less terms and conditions of approval. <br />Mr. Johnson made a MOTION approving the Majestic Pines Community Church, XXX <br />Centerville Road, Site Plan Review and Conditional Use Permit based on the following: <br />1. Parking adjacent to Centerville Road shall be setback at least 20'. <br />2. Berming or landscaping shall be added around the entire site to provide a better <br />screen from the pubic road and public waters. The City Environmental Specialist shall <br />approve the landscaping plan. <br />3. Parking lot lighting shall be adjusted so that light levels as measured at the property <br />line do not exceed .4 foot - candles. <br />4. Lighting of the parking lot shall only be on an as ne <br />parking lot and on the building shall not shine up or <br />shall be reviewed with the building permit. <br />ghting in the <br />ex' o fighting on the building <br />5. Any and all conditions required by the V °;s k rea Water Management <br />Organization shall be complied with. <br />6. All signs shall meet the ordina ems° t. Sign permits are required for all <br />signage. <br />7. The plan is subject to t and approval of Anoka County and proper permits <br />shall be obtained prior <br />8. The permit an <br />ment of construction. <br />bject to the review and approval of the City Engineer. <br />9. Vertical plantin_ all be added next to the building to help break up the <br />massiveness. <br />10. The site must be able to support a septic system that meets state, county, and city <br />requirements. <br />11. The separate lots shall be combined to be one tax parcel. <br />12. Rooftop equipment shall be screened and the screening plan shall be subject to City <br />staff review and approval. <br />13. This approval and the conditions do not imply approval of Phase II. Phase II building <br />and parking requires an amendment to the conditional use permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.