Laserfiche WebLink
• <br />• <br />Planning & Zoning Board <br />December 8, 1999 <br />Page 6 <br />of land to the west of the school area to Main Street so they can access the parcel from <br />Main Street. <br />Mr. Schmidt stated they have deeded the lake parcel to the watershed and posted a <br />$40,000 cash bond with the RCWD. <br />Chair Schaps asked the applicant if he has any difficulty with the recommended <br />conditions. <br />Mr. Schmidt stated that he is not responsible for mitigation but is responsible for grading <br />on site. He advised that North Suburban has put up money with the Watershed and asked <br />how he can assure the mitigation will be done. <br />Mr. Powell clarified the conditions are with North Suburban Development, which will be <br />addressed in the development agreement. <br />Ms. Lane asked if this is a 2:1 mitigation ratio. Mr. Sc dt s is greater than a 2:1 <br />ratio since they reduced the wetland impact. <br />Mr. Powell reviewed the mitigation requireme <br />Mr. Johnson noted the location adjacent t <br />will be retained in private ownership, <br />noted the maintenance program in <br />committee will monitor the mitieat <br />grading plan criteria has bee <br />Mr. Corson stated his <br />Menkveld but the deve <br />things done. He <br />this is why the C <br />date are all indicate <br />can step in to comple <br />A. <br />ditch. He asked if the mitigated land <br />itch will be maintained. Mr. Powell <br />grading plan. He advised how the TEP <br />ssure a wetland is established and the <br />his application is for the creation of a wetland by Mr. <br />s TSM and Mr. Menkveld has a past history of not getting <br />ese two projects can be tied together. Mr. Powell stated <br />useful since the conditions, letter of credit, and completion <br />d drafted to assure timely completion. If not completed, the City <br />the project. <br />Bob Johnson, resident, stated his property is north of this site and he is concerned about <br />how close the south line will be graded towards his property. <br />Mr. Powell presented a drawing indicating the proposed grading, noting it is fairly flat <br />(3:1 ratio) at the location mentioned by Mr. Johnson. He stated there will be a gradual <br />drop -off with undulating elevations across the site. <br />Mr. Corson made a MOTION to close the public hearing at 7:05 p.m., and was supported <br />by Ms. Lane. Motion carried 7 -0. <br />