Laserfiche WebLink
Planning & Zoning Board <br />April 8, 1998 <br />Page 11 <br />• 11. Move temporary cul -de -sac back within 50' -75' of the west property line. <br />12. Add a buffer in the form of trees on the north end. <br />13. Change condition #8 from 20' to 15'. <br />Chair Schaps then asked if the variances should be done individually and Mr. Brixius <br />stated that they could be grouped, but separate from the plat approval. <br />Mr. Dunn made a MOTION to approve preliminary plat for Glen Rehbien Companies, <br />pursuant to the conditions as revised, and was supported by Mr. Johnson. Motion carried <br />6 -0, with Mr. Corson abstaining. <br />Mr. Johnson made a MOTION to approve variances for cul -de -sac length, block length, <br />and street right -of -way, for Glen Rehbien Companies and was supported by Mr. <br />Robinson. Motion carried 6 -0, with Mr. Corson abstaining. <br />D. PUBLIC HEARING, Village Plat II, Preliminary Plat, south /east corner of I- <br />35W and Lake Drive <br />Chair Schaps declared the public hearing open at 7:47 p.m. <br />Ms. Wyland explained that the City is requesting review and approval of the Village No. <br />2. This plat consists of a replat of a portion of the Village No. 1 with the addition of the <br />recently acquired County parcel intended to house the City Complex, future community <br />center (YMCA) and village green. To facilitate construction of the City Complex, a <br />platting of the parcel is required. The plat will consist of one lot, Lott, Block 1 which is <br />9.64 acres in size, and one outlot, Outlot A which is 18.4 acres in size. As future <br />development occurs the outlot will be replatted. The lot dimensions and area meet the <br />requirement of the PSP Zoning District. <br />Ms. Wyland stated that the City's Engineering Consultant, OSM, has reviewed the plat to <br />insure the proposed extension of Town Center Parkway will fit within the design of the <br />current roadway. The current roadway configuration is 80' to accommodate a landscaped <br />median, the extension will not contain a median and is therefore proposed at 60' in width. <br />Drainage plans have been developed for the site and permit approval from the Rice Creek <br />Watershed District is expected on Wednesday April 8. Easements will be provided over <br />all wetlands as is required by our ordinances. <br />Staff recommended approval of this preliminary plat, with the following conditions: <br />1. Easements are provided as per the City Subdivision Ordinance along lot lines and <br />• wetlands /drainage ways. <br />