My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/1998 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1998
>
04/08/1998 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:20:28 AM
Creation date
7/16/2014 8:44:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
04/08/1998
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />April 8, 1998 <br />Page 3 <br />purposes only. Mr. Robinson asked when they intended to do the berming and Ms. <br />Wyland explained that it would be done in 1 to 1 1/2 years, prior to the placing of any <br />exterior storage. <br />Mr. Robinson stated that the reason he questioned that is because when they rezoned six <br />months ago neighbors were concerned about the noise and the berm would help. Ms. <br />Wyland said a representative from Molin Concrete is present this evening if the Board <br />had any questions for him. <br />Mr. Johnson asked if there had been any problems with the current onsite disposal <br />system. Ms. Wyland stated she was not sure but they would have to expand it for their <br />new facility, as they are planning an office building as part of their phasing. <br />Randy Molin, Facility Manager of Molin Concrete, explained that they are planning to <br />implement the berm after the new addition, which is their next focus, and are looking at <br />the plantings and wetland relocation at this time. <br />Chair Schaps verified that the plan was to have the berm and plantings in before the <br />storage goes in. <br />Mr. Schilling asked what the schedule was for Phase 1. Mr. Molin responded explaining <br />that the drawing they had was not very accurate and the berm was not included in Phase <br />1, which is currently under construction. They are just starting to look at Phase 2, the <br />office facility. He stated that the anticipated time of completition is July. <br />Mr. Corson asked if there were any issues of sewer line capacity that needed to be looked <br />at. Mr. Molin said no, stating that everything was sized for this facility. <br />Chair Schaps asked if Mr. Ahrens, City Engineer, had looked at this and Ms. Wyland <br />indicated that he had. <br />Mr. Robinson made a MOTION to close the public hearing at 6:45 p.m., and was <br />supported by Mr. Johnson. Motion carried, 7 -0. <br />Mr. Johnson made a MOTION to approve the MUSA expansion to allow connection to <br />City utilities, and was supported by Mr. Schilling. Motion carried 7 -0. <br />B. PUBLIC HEARING, Tracy Douglas, 540 Lilac Street, MUSA Expansion to <br />allow connection to City utilities <br />Chair Schaps declared the public hearing open at 6:45 p.m. <br />II Ms. Wyland explained that Mr. and Mrs. Douglas own approximately 7 acres on the <br />north side of Lilac Street just west of the proposed Apollo Drive extension. Their current <br />
The URL can be used to link to this page
Your browser does not support the video tag.