Planning & Zoning Board <br />September 9, 1998 <br />Page 14 <br />Mr. Johnson indicated he supports the concept plan with the staff recommendations. Mr. <br />Robinson agreed. <br />Chair Schaps asked if a park plan is in place. Mr. Carlson went over the background of <br />the property. He referred to a map which showed the location of the park dedication. He <br />stated the two existing property owners are receptive to his plan. <br />Chair Schaps asked about acreage. Mr. Carlson went over a map that showed wetland <br />and mitigated. The wetland area has been doubled. He stated he has met with the Park <br />Board. Trail access is on the north. There is an easement which will be driveable. <br />Mr. Dunn asked which way the water will flow from the created ponds. Mr. Carlson <br />indicated he can not answer that at this time. Mr. Powell stated the flow will go to the <br />existing storm system, which is to the south. <br />Mr. Dunn stated he felt the plan is acceptable. He indicated he would like to see a traffic <br />analysis and figures regarding the capability of 62nd Street in its current mode. He stated <br />specifics are needed for balance. Mr. Powell stated that in general terms, for a <br />connection, 62nd Street will have to be upgraded. <br />Mr. Dunn stated it will be easier to upgrade 62nd Street because it does not have to go to <br />the voters. <br />Mr. Schilling asked if Mr. Carlson has any problems with the conditions outlined by <br />staff. Mr. Carlson stated he agrees that 62nd should be improved. <br />Mr. Corson asked if the road is not put in now will there be enough lots to the south to <br />justify the road. Mr. Carlson indicated there will not be enough lots to justify the road. <br />Mr. Powell stated an agreement will be negotiated. <br />It was the consensus of the Planning & Zoning Board of a favorable response to the <br />concept plan keeping in mind the following issues: <br />1. All the land required for the extension of West Shadow Lake Road must be <br />dedicated for that use at the time of final plat approval. The concept plan shows <br />the street dedication are overlapping a corner of another land owner's lot. Using <br />this piece of land will require the owner's permission. Another option is to revise <br />the site plan so that the street dedication area is shifted to the east and does not <br />include another owner's land. <br />2. The street dedication are south of the cul -de -sac should be shifted slightly to the <br />east so that lot 8 does not extend south into a thin band of upland. This will <br />increase the amount of buildable land on the west side of the road. <br />• <br />• <br />• <br />