Laserfiche WebLink
Planning & Zoning Board <br />March 12, 1997 <br />Page 2 <br />this interim use until full development occurs. If the City chooses to <br />accommodate this application, it will require an amendment to the zoning <br />ordinance, SC Zoning District, either as part of updating the ordinance or as a <br />separate amendment. As a part of this amendment, the City must establish <br />procedures, conditions and standards under which this interim use permit will be <br />acceptable. <br />Mr. Brixius stated that the site meets or exceeds the minimum standards for size <br />and setbacks in this zoning district. A 768 square foot pro shop is proposed on <br />the site that will be finished in vertical lap siding with asphalt shingles. Access to <br />the site is located at the corner of County Road 23, which would have to be <br />approved by Anoka County. The site is within the Municipal Utility Service Area <br />(MUSA) but is not currently being served with public sewer. Mr. Brixius stated <br />that he does not believe an underground hookup would be appropriate for an <br />interim use. Possibly screened port -a- toilets can be used. Approximately 68 <br />parking spaces are recommended at 1.5 spaces per tee. The plan indicates that <br />there will be between 45 and 55 tees. Staff is recommending revision to the <br />circulation plan of the parking lot. Because of concern about creating a <br />permanent surface for the parking area as required by code, the City Engineer <br />has proposed acceptance of a gravel surface parking lot as long as appropriate <br />signage delineates each individual parking space, including handicapped <br />parking. <br />Mr. Brixius noted that the driving tees must be 300 yards, not 300 feet as <br />mistakenly shown with a 12' x 12' swing zone for each tee and a sidewalk to <br />designate the pedestrian area. It is required that the applicant demonstrate a <br />plan for containing balls. He strongly recommended business hours from dawn <br />to dusk, with no night hours. Additional issues of drainage and grading will be <br />reviewed by the City Engineer. <br />The zoning ordinance defines termination of the interim use permit based on the <br />following: <br />1. The date stated in the permit; <br />2. Upon violation of conditions under which the permit was issued; <br />3. Upon change in the City's zoning regulations which renders the use <br />non - conforming; <br />4. The redevelopment of the use and property upon which it is located <br />to a permitted or conditional use as allowed within the respective <br />zoning district. <br />Because of the high profile of this site as a prime development location, it is <br />recommended that, if approved, the interim use permit be subject to a specific <br />termination date five years from the date of approval, which also specifies the <br />time period that temporary standards will be allowed. <br />• <br />• <br />• <br />