Laserfiche WebLink
Planning & Zoning Board <br />November 12, 1997 <br />• Page 12 <br />• <br />• <br />F. Bruce Hanson, Surfside Seaplane Base, 6980 Lake Drive, Site Plan Review <br />Ms. Wyland provided the following background for this item: Mr. Hanson of Surfside <br />Seaplane Base is asking for a site plan review to allow for the construction of two <br />additional hangers on his property at 6980 Lake Drive. This particular site has <br />experienced various zoning classifications over the years from commercial to resididential <br />and back to commercial. The present zoning classification is R -1 Single Family. The <br />Conceptual Land Use Plan for Planning District 2 has identified this area as a private <br />airfield surrounded by a performance zoning district. The intent of the performance <br />zoning district was to provide for uses that would be compatible with the existing airfield <br />which has been in this location for more than 40 years. <br />Staff determined that the proper channel for reivew of this item is the Site Plan Review <br />procedure. The Zoning Ordinance provides that any use, other than single family, requires <br />a site plan review. The Ordinance also limits exterior storage in both the residential and <br />commercial zoning districts. The construction of two airplane hangers on this site will <br />reduce the existing exterior storage which is currently considered a pre - existing non- <br />conforming use of the site. Mr. Hanson's plan is to construct the larger hanger as soon as <br />possible and the smaller hanger in the Spring. <br />The hangers are constructed of architectural steel with concrete floors. The exterior will <br />be vinyl or metal siding to match or blend with the color of the existing storage buildings. <br />The larger building is proposed to be 4800 square feet (60 x 80), while the smaller <br />building will be 3600 square feet (60 x 60). Both buildings will be located 30 feet from <br />the rear property line and approximately 15 feet apart. These setbacks are within the <br />requirements of the Ordinance, which provides for a 5 -foot setback. <br />Staff recommended approval of this site plan review in order to reduce the existing <br />exterior storage on the site, pursuant to the following conditions: <br />1. Proper building permits are obtained prior to construction. <br />2. Any additional exterior lighting proposed shall require a detailed lighting plan <br />reviewed by City Straff and the CPTED Officer. <br />3. No additional exterior storage is allowed. The intent of the hanger is to reduce <br />existing exterior storage on the site. <br />4. Exterior coloring of the proposed buildings shall blend with the existing structures. <br />5. Construction of the second hanger shall ble initiated within one year of the date of <br />this permit. <br />6. Drainage plans shall be reviewed by the City Engineer. <br />7. Permits shall be obtained from the RCWD if required. <br />