My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/12/1996 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1996
>
06/12/1996 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 10:49:21 AM
Creation date
7/16/2014 11:02:00 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
06/12/1996
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING & ZONING BOARD <br />JUNE 12, 1996 <br />Mr. Arndt stated that there are plans to screen the bituminous, sand and topsoil stored on the <br />site with crushed aggregate. Pines have been planted to screen the entire storage area. <br />Mr. Dunn asked if there are any environmental concerns with the storage of these materials. <br />Ms. Wyland stated that the company has all necessary permits from the Rice Creek Watershed <br />District (RCWD). <br />Chair Schaps asked if the company is willing to comply with staffs recommendation for a <br />front setback of 30 feet and the purchase of additional property to eliminate the variance on <br />the west side. <br />Mr. Arndt stated that he would prefer to be able to extend the building in a straight line <br />without having to acquire property for two reasons: 1) there is a drainage swale ditch that <br />cannot be built on; 2) while the company has the right to exercise its option to purchase the <br />adjacent Paul Miller property, he would prefer not to do so at this time because of the cost <br />of the improvements being put in. Regarding the 30 foot setback, again, they would prefer <br />not reducing their building size but it would be possible. <br />Mr. Johnson made a MOTION to approve the site plan review with the following conditions: <br />1. Proper building permits be obtained prior to any construction and 1% of the <br />construction costs be in escrow to insure completion of all site improvements. The <br />City's CSO Officer shall review the building plans prior to issuance of the building <br />permit to insure compliance with CEPTED recommendations. <br />2. Landscaping of the site shall be coordinated with the City Forester prior to issuance <br />of any building permits. <br />3. Signage shall conform to the City's Sign Ordinance and proper permits obtained prior <br />to installation. <br />4. RCWD Permits shall be obtained, if required, prior to any site grading. <br />5. Utility, grading and drainage plans shall be reviewed and approved by the City <br />Engineer. <br />6. A variance for 20' on the front setback (Phelps Road) shall be approved allowing a <br />setback of 30'. The variance setback requested on the west property line is denied. <br />7. Concrete curb, gutter and bituminous paving shall be provided for all access <br />driveways and parking area. <br />Mr. Herr seconded the motion. The motion carried 7 -0. <br />3 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.