Laserfiche WebLink
anning Consultant <br />tor Wyland, EDAAB <br />• <br />• <br />• <br />CITY OF LINO LAKES <br />PLANNING & ZONING BOARD MINUTES <br />near Schne. <br />itts <br />Dractor Wessel <br />.............................. ............................... <br />............................. ............................... <br />.............................. ............................... <br />I. CALL TO ORDER AND ROLL CALL: <br />II. APPROVAL OF MINUTES: John Landers made a motion and was <br />supported by Al Robinson to approve the minutes of the <br />September 8, 1993 as submitted. All voted aye. Motion <br />carried. <br />III. OPEN MIKE: No one was present to speak under Open Mike. <br />IV. ACTION ITEMS: <br />A. 93 -5 -P, Oaks of Lino, Aspen Lane Subdivision - Revised Plan <br />Planning Consultant Brixius reviewed the staff report and <br />indicated that Hokanson development has resubmitted this <br />proposal, previously approved by the Planning & Zoning Board, <br />because of problems encountered in getting approval of the <br />grading plan by the RCWD. The new proposal provides for 9 <br />buildable lots rather then the previously approved 11 and <br />minimal filling of the wetlands. The proposal also requires <br />variances for irregular lot shapes and cul de sac length. <br />Recognizing the physical constraints to the subject property, <br />staff would recommend approval of the sketch plan with the <br />conditions outlined in the October 12, 1993 report from NAC. <br />Mr. Corson, representing Hokanson Development, was present and <br />indicated that he agreed with the staff report. <br />Tom Mesich stated that the design presented was a better plan <br />than the one previously approved. Chairman Schaps indicated <br />that the concept was improved. Al Robinson did not think the <br />additional cul de sac length would be a problem. Mr. Robinson <br />