My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/04/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
01/04/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 3:11:07 PM
Creation date
7/23/2014 8:32:59 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/04/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2000 ACCOMPLISHMENTS <br />• <br />• <br />Parks Department <br />Behm's Park <br />e Southern portion of park seeded with prairie grass and wild flowers <br />• Irrigation system installed <br />• Looped trail paved <br />• Northern portion of park graded and seeded <br />• Park benches and picnic tables installed with concrete pads <br />Brandywood Park <br />♦ New playground equipment was installed <br />♦ Trail adjacent to the boardwalk was paved <br />♦ Park benches and pads were installed <br />City Hall Park - West Field <br />• New player bench areas including benches, concrete pads, and fence apron <br />• New out of play fencing and backstop repaired <br />• FLAAA contributed $2,500 towards these improvements <br />Centennial Middle School Fields 3 and 4 <br />• Expanded infield area <br />♦ Removed 2-4 feet of contaminated sod <br />♦ Moved irrigation heads <br />• Added additional ag -lime <br />Lino Park <br />♦ Striped recently paved parking lot <br />Marshan Park <br />• Southern portion of park stripped topsoil, imported fill, replaced topsoil, graded <br />Rice Lake Estates Park <br />• Site prepped and seeded 6,500 square feet of native prairie grass and wild flowers <br />• Resurfaced basketball court (contracted) <br />Shenandoah Park <br />♦ Reclaimed overgrown, wooded area adjacent to playground area <br />Sunrise Park <br />• Electronic Scoreboards were installed at Fields #1 and #2. <br />Trails <br />• Wenzel Farms Trail loop, from Snow Owl Lane to Ivy Ridge Lane, completed including <br />paving, boardwalk, split rail fencing, and restoration <br />• Over -laid 1,300 feet of trail in South Reshanau Lake Estates area <br />♦ Milled, patched, crack filled 3 miles of existing trail <br />• Large landscape project along Marshan Trail (15 trees, 70 shrubs) <br />e Lilac Street, east of Appaloosa Lane paved <br />• Trail connecting the Palomino Lane cul -de -sacs paved <br />• Installed new trail head signs throughout trail system <br />
The URL can be used to link to this page
Your browser does not support the video tag.