Laserfiche WebLink
Clearwater Creek Master Planning Meeting - December 4, 2000 <br />Minutes <br />• Gazebo /seating areas <br />• Benches located around play area <br />• Small parking lot <br />• Restroom enclosure <br />• Warming house <br />• Hockey rink <br />• Open green space: informal ballfield /general skating <br />Mr. Shoenbauer noted that a hockey rink is very expensive and <br />will bring more use and programming into the park. He asked for <br />design direction regarding the two concepts. <br />Residents agreed that a more formal statement on the entrance <br />corner is desired but preferred the park be more informal as you <br />go through it. Residents preferred to the trail loop from <br />concept #2 and determined the following amenities should be <br />included in the park: <br />• Open skating <br />• Play area equipment <br />• Gazebo structure /picnic area with arbor wings <br />• % court basketball court <br />• Sand volleyball <br />• Open space: ballfield overlay (1 panel backstop) <br />• Trails <br />• Irrigation <br />• Benches <br />• Picnic tables <br />Rick explained the process used for park development funding <br />noting there is currently no dollars available to develop the <br />park. He stated the next step is to refine the plan and present <br />it to the City Council on January 8, 2001. He noted he would <br />send a copy of the revised plan to residents who signed in. <br />The meeting was adjourned at 7:15pm. <br />Respectfully Submitted, <br />Kim Points <br />Recording Secretary <br />2 <br />