Laserfiche WebLink
• Item 3. Cost Breakdown for Land Acquisition <br />• <br />• <br />Outdoor Recreation Grant <br />Clearwater Creek Park — Lino Lakes <br />2 of 8 <br />The 5.5 acre parcel of land is currently owned by the City of Lino Lakes. <br />Therefore, there is no additional land acquisition associated with Clearwater <br />Creek Park. <br />Item 4. Cost Breakdown <br />Description Total Price <br />Removals, Earthwork, Erosion Control, Etc. 35,000 <br />8' Wide Asphalt Trail Construction (approximately 2,600 linear feet) 27,500 <br />Seed / Sod 8,500 <br />Landscaping 15,000 <br />Pre - fabricated Gazebo, Concrete Base & Footings, 4 Picnic Tables, etc. 34,750 <br />Miscellaneous Site Amenities (benches, picnic tables, trash receptacles, bike 15,500 <br />rack, etc.) <br />Ornamental Fence (adjacent to play area) 15,250 <br />Sand Volleyball Court 4,500 <br />'/z Basketball Court— 54' x 50', adjustable backboard from 6 - 10 feet in 8,000 <br />height to appeal to variety of age groups and abilities <br />Chainlink Backstop for Informal Ball Field 3,500 <br />Play Area - Includes separate structures for 2 - 5 age group, 6 - 11 age 70,000 <br />group, and swings. Approximate play area is 7,000 square feet. Includes <br />concrete curb container, safety surface, etc. <br />Identification Signage 5,000 <br />Surveying 10,000 <br />Sub -Total $252,500 <br />Contingency (10 %) $25,250 <br />Design & Engineering Fees (15 %) $37,875 <br />Total Estimated Cost - Clearwater Creek Park Site Improvements $315,625 <br />