My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/30/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
07/30/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:51:21 PM
Creation date
7/23/2014 10:35:01 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
07/30/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />July 24, 2001 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Girl Scout Service Award Projects <br />Ashley Grundtner, Lisa Hatlestad, and Esther Neu have recently completed their service award <br />projects by enhancing the city park system. <br />ASHLEY GRUNDTNER - PAINTING AT CITY HALL PARK WARMING HOUSE <br />Ashley's Silver Award Service project consisted of painting the interior of the City Hall Park <br />warming house. This included all walls, window frames, doors, and benches. Ashley also painted <br />several "Charlie Brown" winter murals for area residents to enjoy. <br />Ashley was involved with all phases of her project from material selection to mural design. Ashley <br />completed her project in a very responsible and timely manner and the finished results are a <br />dramatic improvement over the building's previous appearance. <br />LISA HATLESTAD - GENERAL CLEANUP AND NEW PARK ENTRANCE SIGN <br />PROJECT AT SUNRISE PARK <br />Lisa's Gold Service Award project consisted of general clean-up and a new park entrance sign at <br />Sunrise Park. The general clean-up project consisted of tree and shrub trimming, tree and shrub <br />removal, and general cleanup at Sunrise Park. The entrance sign project was quite involved and <br />consisted of the following tasks: <br />➢ Removal of old sign and plant material. <br />➢ Reshaping of berm at old sign location. <br />➢ Removal of storm damaged spruce tree at new sign location. <br />➢ Installed earthen berm at new location. <br />➢ Installed landscape block for raised oval planting bed. <br />➢ Selected and installed plant material. <br />➢ Installed new park sign. <br />➢ Installed landscape fabric and woodchip mulch. <br />➢ Sodded around new sign. <br />• Lisa was involved with all phases of the project from the design of the landscape bed to the laying <br />of sod. She did an excellent job of keeping on task. <br />
The URL can be used to link to this page
Your browser does not support the video tag.