My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/02/2002 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2002 Park Board Packets
>
12/02/2002 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:09:47 PM
Creation date
7/23/2014 12:50:43 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
12/02/2002
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Park Board Meeting - November 4, 2002 <br />Minutes <br />with Santa event reached its capacity of 200 individuals on <br />September 30 - the earliest its ever filled. Due to this early <br />fill date, the City added an additional 20 spots. As of <br />September 29, 2002, only four of the newly added spots remained. <br />Rick added the City is currently working on the winter brochure <br />and is due in homes the last week of November. <br />Pam asked where the Breakfast with Santa event will be held. Rick <br />advised the event will be held at St. Joseph's Church. <br />PARKS DEPARTMENT UPDATE: <br />Rick reviewed a memo from Mike Hoffman, Parks Supervisor, which <br />summarizes the maintenance highlights for October 2002. Rick <br />noted maintenance activities have included mowing of all park <br />areas, completed irrigation system blowouts, a chain saw safety <br />training, and the ordering of plant material for spring 2003. <br />Rick noted a number of young trees have been vandalized (snapped <br />off) at several parks. Replacements have been ordered. <br />Pat stated he frequently sees kids in parks swinging golf clubs <br />at the trees. <br />PROJECT UPDATES: <br />Clearwater Creek Park - Rick advised in order to create better <br />soils and to establish healthy turf, approximately 1500 cubic <br />yards of peat was delivered to the park area. The peat was <br />spread throughout the park and chisel plowed. As soon as the <br />weather cooperates, a netavator will be used to till the peat and <br />mix a couple inches of subsurface clay with the imported peat. <br />The park area will then be surveyed and final graded. Depending <br />upon the completion of the above work, the park area will either <br />be dormant seeded yet this fall or seeded next spring. The <br />trails and basketball court will be paved next spring. <br />The remaining landscaping was recently completed. The gazebo <br />roof panels, beams and rails have been painted and installed. <br />Electrical service will be run to the gazebo next spring. <br />Highland Meadows Park - Rick advised the development of Highland <br />Meadows Park has seen tremendous progress the past few months. <br />All onsite earthwork including stripping of the vegetative growth <br />and grading work have been completed. One thousand cubic yards <br />of topsoil was imported, spread, and graded throughout the entire <br />park area. All asphalt work including the installation of trails <br />and a half court basketball court, as well as concrete work <br />including the play area curbing, picnic table pads, and park <br />bench pads were also completed. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.