Laserfiche WebLink
• <br />• <br />Park Board Meeting - November 4, 2002 <br />Minutes <br />with Santa event reached its capacity of 200 individuals on <br />September 30 - the earliest its ever filled. Due to this early <br />fill date, the City added an additional 20 spots. As of <br />September 29, 2002, only four of the newly added spots remained. <br />Rick added the City is currently working on the winter brochure <br />and is due in homes the last week of November. <br />Pam asked where the Breakfast with Santa event will be held. Rick <br />advised the event will be held at St. Joseph's Church. <br />PARKS DEPARTMENT UPDATE: <br />Rick reviewed a memo from Mike Hoffman, Parks Supervisor, which <br />summarizes the maintenance highlights for October 2002. Rick <br />noted maintenance activities have included mowing of all park <br />areas, completed irrigation system blowouts, a chain saw safety <br />training, and the ordering of plant material for spring 2003. <br />Rick noted a number of young trees have been vandalized (snapped <br />off) at several parks. Replacements have been ordered. <br />Pat stated he frequently sees kids in parks swinging golf clubs <br />at the trees. <br />PROJECT UPDATES: <br />Clearwater Creek Park - Rick advised in order to create better <br />soils and to establish healthy turf, approximately 1500 cubic <br />yards of peat was delivered to the park area. The peat was <br />spread throughout the park and chisel plowed. As soon as the <br />weather cooperates, a netavator will be used to till the peat and <br />mix a couple inches of subsurface clay with the imported peat. <br />The park area will then be surveyed and final graded. Depending <br />upon the completion of the above work, the park area will either <br />be dormant seeded yet this fall or seeded next spring. The <br />trails and basketball court will be paved next spring. <br />The remaining landscaping was recently completed. The gazebo <br />roof panels, beams and rails have been painted and installed. <br />Electrical service will be run to the gazebo next spring. <br />Highland Meadows Park - Rick advised the development of Highland <br />Meadows Park has seen tremendous progress the past few months. <br />All onsite earthwork including stripping of the vegetative growth <br />and grading work have been completed. One thousand cubic yards <br />of topsoil was imported, spread, and graded throughout the entire <br />park area. All asphalt work including the installation of trails <br />and a half court basketball court, as well as concrete work <br />including the play area curbing, picnic table pads, and park <br />bench pads were also completed. <br />5 <br />