My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/03/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
02/03/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:06:11 PM
Creation date
7/24/2014 8:30:51 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/03/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Park Board Meeting - December 2, 2002 <br />Minutes <br />agreed that several areas will be redone next spring. Staff is <br />very disappointed with the quality of the bituminous work and <br />will be hesitant on using this particular subcontractor on any <br />future work. <br />All landscaping except the landscape bed adjacent to the <br />playground area and the Oak Trees have been installed. The <br />irrigation system has also been installed. <br />Bid openings for the playground equipment proposals will be on <br />December 2, 2002. The Park Board is welcome to review the <br />proposal after the December 2 Park Board meeting the playground <br />equipment proposals will be on display for residents the week of <br />December 9. <br />Timberwolf Trail - Rick advised this trail segment has been <br />completed. There is still some restoration and cleanup work, <br />which will be done next spring. This trail turned out very well <br />and will generate a lot of use. <br />Birch Park Trail - Rick advised this trail is nearing <br />completion. The timber staircase has been completed as well as <br />the pier shafts have been installed. The remaining deck work <br />should be completed by mid December. Park Maintenance staff will <br />install the plant material for the timber staircase next spring. <br />Michael inquired about the Skate Board park. Rick stated the use <br />at the Skate Board Park is down from previous years and there has <br />been some vandalism. Other than that the park has done well. <br />The Park Board may evaluate the park at some point in the future <br />to determine whether or not it should stay open. <br />Rick noted the equipment at Woods of Baldwin Lake Park has been <br />replaced. <br />Katie asked if repairs will be made at Highland Meadows Park or <br />if the City has to live with the poor bituminous work. Rick <br />stated staff and the contractor came to a consensus on what made <br />sense to replace. <br />Pat inquired about the status of the Comprehensive Parks Plan. <br />Rick stated staff was waiting for environmental information to <br />include in the plan. It now makes sense to put all of the <br />information together and possibly revise the Comprehensive Parks <br />Plan. <br />NEXT PARK BOARD MEETING: <br />Rick advised the next Park Board meeting would be held on Monday, <br />January 6, 2003, 6:30pm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.