My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/02/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
06/02/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:01:48 PM
Creation date
7/24/2014 8:52:29 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/02/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />May 28, 2002 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: May Maintenance Update <br />Maintenance activity during a tree - mendously busy May has included: <br />❑ Planting of over 100 new and replacement trees in City parks, including over 35 in Behm's Park <br />alone. <br />❑ Planted trees, shrubs, and perennials in Trappers Court planting boxes. Installed 4" decorative <br />IDmulch in planting boxes. <br />• <br />❑ Removed and replaced landscape bed in front of Council Chambers <br />- Removed existing plants (most were reused either in new design or replanted in front <br />island). <br />- Removed 3 " -4" of soil from entire bed. <br />- Installed landscape fabric. <br />- Installed new perennials and replanted salvaged roses. <br />- Installed 4" decorative mulch. <br />❑ Game prepped ball fields, as needed (usually 8 -11 per day). This includes dragging, hand <br />raking, chalking foul lines and batters boxes and general cleanup. <br />❑ Garbage pickup — Hopefully we have emptied all cans at least once this spring. (This <br />becomes a weekly duty when all seasonals arrive). <br />❑ Mowing of all park areas. All parks have been cut at least once, but many have yet to be trim <br />mowed or weed whipped. We are prioritizing scheduled athletic fields at this time. <br />Hopefully by the first week in June we will be caught up with the mowing and should be able <br />to keep it under control. <br />❑ Completed Highland Meadows Park playground. <br />- Installed 2 -5 year structure (fire truck). <br />- Installed spring toys and hung swings. <br />- Installed fabric and wear mats. <br />- Installed 12" of wood carpet surfacing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.