Laserfiche WebLink
Park Board Meeting - December 2, 2002 <br />Minutes <br />Rick asked Mr. Johnson to point out the sidewalk /trails along the <br />roadways. <br />Mr. Johnson referred to a map and pointed out the trails. Both <br />of the trails start at Sunset with one ending at the ditch and <br />one going to the cul -de -sac. The plan also calls for a six foot <br />concrete sidewalk. <br />Rick stated the Park Board needs to determine if the trail <br />extension should go all the way to the east. <br />Mr. Johnson stated the Planning and Zoning Board indicated they <br />do want a trail connection to Carl Street. The neighbors are <br />still opposed to the trail connection. <br />Rick stated there was a trail corridor in the 5th Addition. In <br />order to connect that trail it would have to cross the safety <br />zone in the air park. The air park will not allow that to cross <br />so that portion of the trail has been eliminated from the plan. <br />Paul asked if the developer will be installing the trail from <br />north Outlot A to Outlot C. <br />Mr. Johnson advised the developer will be grading and installing <br />class 5 on that trail. The City can pave it when funds become <br />available. <br />Rick stated he believes that trail will not be in that location <br />and it should not be graded. <br />Pat inquired about the logic for the piece of public trail <br />between two private areas. <br />Mr. Johnson advised the purpose is for it to hopefully be an <br />easement for public use. The plan shows it as open space. <br />Pam inquired about the possibility of the private owner adjacent <br />to Outlot C developing that property. <br />Mr. Gary Uhde, developer, stated he has discussed the possibility <br />of developing that parcel. The landowner has expressed interest <br />in development but is in no hurry. The landowner is also aware <br />that the land may go to park use when it is developed. <br />Chair Lindy asked who will be installing the concrete sidewalk. <br />Mr. Johnson advised the installation of the concrete sidewalk has <br />not yet been discussed. <br />4 <br />