My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/04/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
08/04/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:59:10 PM
Creation date
7/24/2014 9:07:59 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
08/04/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />July 29, 2003 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: July Maintenance Update <br />Maintenance activities during July have included: <br />❑ Weekly garbage collection. <br />❑ Weekly park mowing. <br />❑ Irrigation system maintenance and trouble shooting. <br />❑ Equipment maintenance. <br />❑ Daily athletic field preparation — most summer programs have ended. We are now gearing <br />up for fall softball, soccer and football. <br />❑ Warning track renovation — Sunrise #1 and #2. <br />❑ Trail side trimming — As the trail system continues to grow so do the number of hours <br />required to inspect and maintain them. <br />❑ Party Wagon pickup and delivery for 5 dates. <br />❑ Pheasant Hills Park — Installed 40' of 6' high chain link fencing behind basketball 1/2 court to <br />keep balls from entering wooded area. <br />❑ Highland Meadows Park <br />Sod installed along boulevard and playground areas (contracted). <br />Replacement trees planted (contracted). <br />Trail damage repaired (contracted). <br />Washed out prairie areas — reseeded (staff). <br />Site furnishings installed (benches, tables) (staff). <br />Replaced damaged spring toy horse. <br />We have decided to reseed all turf - seeded areas. The storm of June 24th caused extensive <br />erosion, which impacted the quality of the project. In the next 2 weeks we will total kill the <br />turf - seeded areas, till and regrade, adjust depth of sprinkler heads, final grade and reseed. <br />If all goes well we should have a good stand of turf by October 1St <br />❑ Clearwater Creek Park <br />Seeded bare soil areas to Ann. Rye (staff). <br />Installed site furnishings (tables and benches) (staff). <br />Installed basketball goal and post. Painted court (contracted). <br />Soon we will total kill this site, final grade, seed bed prep. and seed this park. We hope to <br />have seeding completed by August 15 — 20. <br />
The URL can be used to link to this page
Your browser does not support the video tag.