Laserfiche WebLink
4. W enk feasible without damaging trees and quality wetland plant communities, spoil <br />piles.firom previous excavations on the property should be removed and spread on <br />upland areas. <br />5. Detailed grading and seeding plans will be prepared prior to project implementation. <br />6. Appropriate-infiltration methods will be utilized, where feasible, in the placement, <br />design, and construction of the trail to minimize backyard runoff from directly <br />entering adjacent wetlands. <br />7. In year 2003, trees that have been killed or are determined to be dying due to <br />increased water levels within Wetland Q. will be removed. <br />8. "Hazard. Trees" adjacent to the trail will be removed at the time the trail is <br />constructed. <br />