Laserfiche WebLink
FEB -07 -2000 14:56 <br />AMIIIIPUI■ BRCO�LNTA <br />8301 State Hwy 29 N. • Alexandria, MN 56308 <br />RE: Wenzel Farms Pedestrian Bridge <br />Lino Lakes, MN <br />February 1, 2000 <br />Telephone 320 -852 -7500 <br />Toll Free 800 - 328 -2047 <br />FAX 320 -852 -7067 <br />E -MAIL conbridg@ <br />continentalbridge.com <br />To Whom It May Concern: <br />Continental Bridge is pleased to offer you the following Quote proposal for the above referenced <br />project. This letter will outline the scope of work that we will provide. This proposal considers <br />the following bridge specification assumptions. Any change to these assumptions will need to be <br />evaluated for any adjustment to this proposal. Continental Bridge will Design, Fabricate and <br />Deliver the following: <br />1 only -50'x 6' Continental Bridge, half - through truss, one diagonal per panel, square end <br />vertical, bearings at equal elevations, 2% % camber (arch) per specifications (note- this <br />slope exceeds ADA requirements), fabricated from atmospheric corrosion resistant steel, <br />nominal 2 "x10" pressure treated wood decking, horizontal safety rails placed on the <br />outside of the truss to produce a maximum opening of less than 4" to a minimum height <br />of 42 ", 85 psf uniform live load, or one 1,0001b. concentrated load, 35 psf uniform wind <br />load over the vertical projection of the bridge as if enclosed. <br />F.O.B. Lino Lakes, MN $14,386.00 �✓�� y 0c. C- <br />OI.) Y. <br />1 only -50'x 8' Continental Bridge, same specifications. <br />F.O.B. Lino Lakes, MN $16,389.00 <br />1 only- 50'x 10' Continental Bridge, same specifications. <br />F.O.B. Lino Lakes, MN $17,629.00 <br />Note: We are proposing a 50' length because of needed clearance issues and less <br />landscaping requirements. <br />The above pricing does not include any applicable taxes, anchor bolts, foundation design or <br />construction, unloading or erection costs. <br />TERMS OF SALE <br />We will typically require a 40% deposit with the order (except to Government Entity) with the <br />balance paid either C.O.D. by certified funds or credit approved. Credit determination on the <br />balance will be made after review of bank and trade references and your labor and material <br />supply payment bond, if any. For Approved Credit: Terms of sale on remaining balance are <br />100% Net 30 days. Payment terms contained in this proposal may not be changed without <br />written authorization from Continental Bridge. Acceptance of any proposal from Continental <br />Bridge constitutes acceptance of these credit terms. <br />Unauthorized retention of payments by Purchaser for any reason shall be subject to a service <br />charge of 2% per month on any balance due past 30 days from invoice date. <br />