My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/07/2000 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2000 Park Board Packets
>
02/07/2000 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:31:57 PM
Creation date
7/24/2014 11:29:48 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/07/2000
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -07 -2000 15:03 651 292 0083 P.25/38 <br />4 Vr <br />{ <br />BRIDGE CONCEPTS <br />The Professional Bridge Company <br />TO: TKDA <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />St. Paul, MN 55101.'2140 <br />PH: 651 -292 -4400 <br />FX: 651 -292 -0083 <br />Attn.: Mr. Paul Hornby <br />January 27, 2000 <br />YBC No. P20022 <br />' From: Steve Visosky, Regional Manager <br />RE: Proposal for the timber bridge at Wenzel Farms. <br />This proposal is being submitted with the intention of providing pricing for the installation of YORK BRIDGE <br />CONCEPTS•design engineered timber bridge for Lino Lakes, Minnesota. The bridges will be builton -site, <br />and the price quoted is for "turn key" construction. We are confident that you will find the York Bridge <br />Concepts staff to be first inservice, and our bridges to be constructed with the highest standards. <br />This proposal is based on YORK BRIDGE CONCEPTS,designs which include the.use of .40 CCA pressure - <br />treated, no. 2 grade, southern. yellow pine (unless otherwise specified), which meets, or exceeds all application <br />guidelines' as , specified by the American Wood Preservers Association (AWPA). Douglas Fir may be <br />substituted for Southem Yellow Pine on any or all timber materials as designated by York Bridge Concepts. <br />'OPTION A: (1) — 6' WIDE PEDESTRIAN PILE SUPPORTED TIMBER BRIDGE <br />..The bridge is designed to accommodate an 85 ptf loading including impact. Constructed with 8" butt pilings <br />(.60 CCA) on 10' centers, 2x10" beams and stringers, 2 "x8" deckboards <br />40 Total linear feet = •$17,300.00 Total <br />• Price is based on a maximum.deck elevation of 6' above grade. , <br />• Price is based on piling at 10' in the ground: In the event refusal is not met at 10' additional materials will <br />be required, resLllting in additional charges. . <br />• Longer pile, if needed, to be charged at.$25.00 per foot of piling. , <br />• Equipment access to stream bed required. . <br />, <br />ABUTMENT WALLS <br />14 linear feet of 3' high abutment wall at.each end of each bridge, <br />using three 3 "x12" boards, 8" dia. butt pilings, 3 "x8" cap board and a filter fabric liner <br />(2) Abutments = $1,620.00 Total <br />HANDRAIL <br />Our standard 42" high timber handrail will be placed along the entire. length of both sides of the bridge. <br />Handrail consists of 4 "x6" posts bolted on 5' centers, 2 "x4" cap•rail, and a 2 "x6" cap and rail. <br />1 80 Total linear feet @ $16.50 per linear foot,= $1,320.00 Total <br />• <br />YBC No. P20022, Page 1 oil <br />York Bridge Concepts 1419 West Waters Avenue PH: 813 - 933 -1304 FX: 813- 932 -6486 Rev 12/3/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.