• <br />Feb. 24. 1998 - 1:35PM BRAUER & ASSOC. <br />Description of Cost item <br />No, 0700 P. 4/4 <br />Lino Lakes Park Bond r%ererenaum Planning <br />Quail Ridge Park Cost Analysis Summary Statement <br />Estimated Cost <br />Assumptions and Clarifications <br />General Site Removals and Site <br />Preparation <br />3,500.00 <br />Assumes relatively minimal existing vegetation removal and limited <br />site preparation <br />General Earthwork <br />8,000.00 <br />As required to level open spaces and turf areas <br />Abandonment of Water Service in <br />Park Area <br />Storm Sewer Piping <br />Asphalt Trails <br />1,800.00 "required, given existing hydrant located in middle of norther part <br />of site <br />1,500.00 For culverts under trails <br />19,000.00 8' wide asphalt on aggregate base as per city standard design <br />Boardwalk (New) <br />22,000.00 <br />Floating boardwalk style as per city standard design (assumes work <br />will be bid — substantial savings could be realized if built in -house or <br />with in -kind neighborhood labor) <br />Boardwalk (Replace Existing) 24,000.00 <br />Floating boardwalk style as per city standard design (assumes work <br />will be bid — substantial savings could be realized if built in -house or <br />with in -kind neighborhood abor) <br />Play Area Equipment. Concrete <br />Curb Container, and Associated <br />Walks <br />45,000.00 <br />Budget figure for listed items <br />Half -Court Basketball <br />8,650.00 <br />Asphalt surface with aggregate base and Coiorcoat surfacing. Heavy <br />duty basketball standard <br />Deck Overlook <br />8,000.00 <br />Simple wood structure with bench <br />Benches <br />2,500.00 <br />As per city standard design (simple wood style preferred) -5 <br />benches <br />Picnic Tables <br />Workout Station <br />6,000.00 As per city standard design (simple wood style preferred) - 5 tables <br />4,500.00 Simple multi-use fixed position workout station (amenities not <br />selected) <br />Landscaping <br />Miscellaneous Site Amenities <br />(0,000.00 Includes budget for sodding, seeding, and landscaping <br />2,000.00 Wood duck boxes, Etc. <br />Dnnking Fountain 3,000.00 Taps into existing waterline servicing the hydrant. Heavy duty style <br />Total *tease Bid Items <br />Cantingency. {.iO%) <br />DeSiSn meneand <br />Surveying Fees (1014). <br />Total Project Budget <br />169,45.0OO The contingency of 10% is the minimal recommended at this level <br />• of design detail and project costing review. Also, it is difficult to <br />ascertain what the bidding environment will be like at the time that <br />the project will actually be built, thus justifying a more cautionary <br />approach to potential project costs. <br />The design, engineering, and surveying fees are based upon <br />general industry standards for this type of project. <br />