My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/04/2000 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2000 Park Board Packets
>
01/04/2000 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:23:29 PM
Creation date
7/24/2014 11:58:29 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/04/2000
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />November 29, 1999 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: November Park Maintenance Update <br />Projects receiving attention during November included the following: <br />♦ Irrigation Systems Winterized - Sunrise, Birch, City Hall and Rice Lake Estates Parks <br />as well as Town Center, Fire Hall and city well houses have all been blown out. In <br />addition Rice Lake Elementary and Centennial Middle School have been completed. <br />♦ A block retaining wall and cedar privacy fence was installed along the north side of <br />the Sunrise Park Lift Station. This was done to abate a noise complaint from a <br />resident to the north. <br />♦ Behm's Park — The playground, kid timber border and resilient surface has been <br />installed. A temporary pleasure skating rink has been installed near the park entrance <br />along Mustang Lane. <br />♦ Hockey and pleasure skating rinks have been re- leveled and are ready for flooding. <br />♦ Ballfields — All ag -lime fields and warning tracks were shallow tilled (2 " -3 ") to <br />relieve compaction and bring more coarse material to the surface. In addition, <br />Sunrise Fields #1 and #2 received approximately 100 tons of ag -lime each to help <br />renovate the infields and warning tracks. <br />♦ A 30' length of split rail fence was installed along the edge of the trail at 701 Country <br />Lakes Drive. This was done at the request of the homeowner to keep trail users from <br />cutting across his property. <br />♦ Quail Ridge Boardwalk — At the time of this writing approximately 3/4 of the <br />boardwalk decking has been removed. We hope to remove the remainder of the <br />decking and the galvanized framework by December 1. <br />♦ Shenandoah Park Backstop — The remainder of the backstop has been removed. <br />Those are the main highlights for November. Now if the weather ever cooperates, we can begin <br />flooding our rinks. <br />sw /mike/November Park Maintenance Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.