My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/01/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
11/01/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 2:33:54 PM
Creation date
7/24/2014 12:17:16 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/01/1999
Park Bd Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES <br />Staff requested a quote from the Otter Lake Road contractor to complete these improvements <br />through a Change Order to their existing contract. After reviewing the contractor's proposal, <br />staff recommends advertising for bids in an effort to reduce the cost of the proposed <br />improvements. <br />Funding for the project will be though special assessments levied against the Construction <br />Laborer's Training Facility, and the City's Area and Unit Fund. The special assessments are <br />calculated following the Lino Lakes Public Improvement Financing Policy', <br />The proposed schedule for the project is as follows: <br />Council Approves Plans <br />Bid Opening <br />Council Awards Bid <br />Construction Begins <br />Substantial Completion <br />otl_.Y <br />June 14, 1999 <br />July 9, 1999 <br />July 12, 1999 <br />July 19, 1999 <br />August 6, 1999 <br />Council asked if this is related to the delay in construction on the new O . - Road. Staff <br />advised that this project is directly related to the construction on 0 Ro. It is also <br />connected to the casing pipe installation on Main Street. <br />Council asked if the north end of the realigned Ott <br />were approved. Staff stated the next project • 1 <br />resume and the Laborer's Training Facili <br />e finished if this project <br />and pipes. Work can then <br />for their connection <br />Council Member Bergeson <br />Member Lyden seconded <br />sol tion No. 99 = 46, as presented. Council <br />otion carried unanimously. <br />Resolution No. 99 - : 's and at the end of these minutes. <br />Consideration of E . - i s ent Encroachment Agreement - The owners of the property located at <br />502 Lonesome Pine Trail have requested a permit for a fence to be located on the rear of their <br />property. This area contains a storm sewer and a catch basin on an easement. <br />This matter was discussed at the previous Council work session. Staff had reviewed the request <br />for the fence permit and denied the permit because of the need to access the easement at a <br />moment's notice. Several options were discussed. Council directed staff to prepare a resolution <br />to this matter so that a fence permit could be issued. <br />Council Member Bergeson moved to approve an Easement Encroachment Agreement at 502 <br />Lonesome Pine Trail based on the following conditions: <br />1. Approval of access gates by City staff. <br />2. Gates are kept unlocked. <br />10 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.